Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    2 jobs found, pricing in USD
    4runner Storage cover 5 days left
    VERIFIED

    Would like a cover designed for the storage cubby holes located in the rear of the 5th generation Toyota 4runner. Made from plastic with small thumb clips or button latch to remove.

    $138 (Avg Bid)
    $138 Avg Bid
    33 bids
    Asphalt Parking Lot 4 days left
    VERIFIED

    Asphalt Project, will require the Villages Planning Commission's approval before a permit is issued. First, Hi Tech will need to Hire a Design Engineer to draw the plans for each parking lot with a). A flood zone component and b). Storm water detention component The Design engineer will need to complete 70% drawings to be submitted to the village's planning commission before they review and approve it. The Villages Ordinance for new parking lots include rules / requirements for Curb and Gutter and storm water detention When the plan is approved by the Planning Commission and the Village Board Hi Tech may be able to apply for Rezoning and the permit As the lots are over one half acre in size and we are in a flood zone we also need a MWRD Permit (Metropolitan Water and Recla...

    $3831 (Avg Bid)
    Local
    $3831 Avg Bid
    12 bids