We need some work on an access report. The report is called rprtmaterialListwithassemblies.
We need the following bugs fixed.
1) The total labour hours and material do not add up versus the labour displayed on the report. This is a problem when we budget hours. The problem seems to be that the total at the bottom does not account for the labour when an item is more than one in a first level assembly.
2) I would like a report that runs at the end of this report that shows the hours and totals each phase.
eg
LA000010 Labour tank, heads, lift lugs 1.5 hrs
LA000080 Labour fittings, tabs,air check 6 hrs
LA000100 Labour final assembly .5 hrs
Total 8 hrs
3) Some of our small parts are costed by the hundreds. (Nuts & Bolts) I need the program to recognize more than just EA.
A copy of our database and some data can be downloaded at [[login to view URL]][1] Username: envirotank Password: 9485262
.pdf files of our problems are attached
## Deliverables
1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done.
2) Deliverables must be in ready-to-run condition, as follows (depending on the nature of the deliverables):
a) For web sites or other server-side deliverables intended to only ever exist in one place in the Buyer's environment--Deliverables must be installed by the Seller in ready-to-run condition in the Buyer's environment.
b) For all others including desktop software or software the buyer intends to distribute: A software installation package that will install the software in ready-to-run condition on the platform(s) specified in this bid request.
3) All deliverables will be considered "work made for hire" under U.S. Copyright law. Buyer will receive exclusive and complete copyrights to all work purchased. (No GPL, GNU, 3rd party components, etc. unless all copyright ramifications are explained AND AGREED TO by the buyer on the site per the coder's Seller Legal Agreement).
## Platform
Microsoft Access 2003